Kampala Executive Aviation · Kajjansi Airfield, Uganda

Crop seeding, spraying and monitoring.
Take your yield to the next level, lower your costs and make every season a success, with KEA.
Use the Next and Back buttons, the arrow keys, or click the right half of the screen. F for full screen, ? for help.
Where we work
The service
Counters assume 15 L/ha and a 70 L tank: this 10-acre strip is about 11 minutes of flying on one tank. Illustrative field layout.
Why KEA
Registered aircraft, licensed remote pilots, UCAA flight approvals and insurance on every job. Products applied according to their labels, with buffer zones and re-entry intervals planned. Your farm's name stays off the incident report.
Calibrated aircraft, checked before each flight. Spray volume held to within 10% of the rate you specify. Wind limits, droplet size and flight height set for the product and the neighbours, by a pilot who can say no.
Field maps you keep, and a per-field record of every application: product, rate, volume, time. Compare blocks and seasons, see what paid off, and plan next season's inputs with evidence.
The safety management system, maintenance discipline and reporting that keep KEA's aircraft flying for the UN and TotalEnergies, applied to your farm's drone work. Our own licensed engineers service the drones in KEA's approved workshop at Kajjansi with DJI parts, so the aircraft that arrives is maintained, calibrated and ready to fly.
The aircraft

KEA is also DJI Agriculture's approved dealer for Uganda, so the aircraft on your farm are maintained and supported by us with factory parts and training at Kajjansi. Specifications: DJI Agriculture, 2025.
Footage
Why a drone beats the knapsack, the tractor and the aeroplane · 1 of 5
Why a drone beats the knapsack, the tractor and the aeroplane · 2 of 5
Why a drone beats the knapsack, the tractor and the aeroplane · 3 of 5
Why a drone beats the knapsack, the tractor and the aeroplane · 4 of 5
Why a drone beats the knapsack, the tractor and the aeroplane · 5 of 5
What changes on your farm
+12.7% rice yield and 22% higher net return with drone application in a 2026 trial. Even cover, on time, across the whole block.
15 L per hectare instead of 500. No more hauling 25 jerrycans of mixing water to the field for every hectare sprayed.
20–30% less chemical in field programmes, with the same control. Precise swaths, no double-spraying, no run-off.
250 acres in two days, not two weeks. Pests, disease and weeds are hit in the window that matters, before they cost you yield.
A spray gang of eight becomes one KEA crew. Your team goes to weeding, harvest and expansion, and nobody walks in the spray cloud.
A record for every field, every application. Maps, rates, volumes and dates you keep, so next season's inputs are planned on evidence.
Rate card 2026–27
Prices in Ugandan shillings, excluding VAT. You supply the products and water; we supply everything else.
| Service | Per acre, UGX |
|---|---|
| Spraying: herbicide, insecticide, fungicide, foliar feed | 30,000≈ USD 6.90 · 74,000 per ha |
| Granular fertiliser spreading | 30,000≈ USD 6.90 · 74,000 per ha |
| Direct seeding and broadcast sowing | 35,000≈ USD 8.00 · 86,500 per ha |
| Invasive weed and bush control, rough terrain | from 50,000from 125,000 per ha |
| Field mapping, flight planning and the per-field application record | Included |
| Volume: up to 15 L/ha at the base rate · 15–25 L/ha +25% · 25–40 L/ha +60%. Terrain: moderate ×1.25, complex ×1.6. | |
| Site charges | |
| Mobilisation and demobilisation, per deployment | 870,000USD 200 · waived from 250 acres |
| Vehicle travel, round trip from Kajjansi | 8,000 per kmUSD 1.80 |
| Generator for battery charging, with fuel, per operating day | 435,000 per dayUSD 100 · nil if you have 3-phase power |
| Crew accommodation and meals, per person per night (crew of 3) | 220,000 per nightUSD 50 · nil if the farm provides |
| Standby day: crew on site, unable to work for reasons outside KEA's control | 1,090,000 per dayUSD 250 |
Herbicide on 250 acres at 15 L/ha, flat fields, 90 km from Kajjansi, three operating days, farm supplies products and water, no farm power or accommodation.
Provide power and accommodation on the farm and the same job costs UGX 9.18m, about 36,700 per acre. Full terms are on the KEA rate card.
In one minute
→ Space next · ← previous · Home/End first/last · F full screen · O overview · R replay the animation on this slide · S sources · Esc close.
Click the right half of the screen to advance and the left half to go back; buttons and controls work normally. Swipe works on phones. The slide number and title sit bottom-left.